Bathroom remodeling in Valjevo

A bathroom remodel is where plumbing, drainage, waterproofing and finishing all meet - and where a mistake in the installation costs the most to fix later. AQUATIM handles the plumbing side of the remodel from stripping out the old to fitting the new sanitary ware, coordinated with the tiler.

The job begins by stripping out the existing sanitary ware and carefully chasing the walls to run new pipework. Often the true state of the old pipes only shows once a wall is open - so we go in with a plan but leave room to react to what we find. New water and drainage points go exactly where the shower, toilet, basin and washing machine will be.

Before tiling we apply waterproofing to the floor and wet zones - a step you can't see in the finished bathroom, but one that stops moisture reaching the neighbouring rooms. With walk-in showers we pay special attention to the fall toward the drain and the sealing of corners. Only onto a properly prepared base do the tiles go.

Finally we fit the sanitary ware, taps, shower and mirrors, connect the washing machine and water heater and test everything under load. The advantage of one contractor is that our team is responsible for the installation - no passing the blame if something leaks. Final joinery and painting are coordinated by arrangement.

What's included

  • Strip-out of old sanitary ware and wall chasing
  • New water and drainage layout to plan
  • Waterproofing of the floor and wet zones
  • Preparing the base for the tiler
  • Fitting of sanitary ware, taps and shower systems

Materials & equipment

  • Waterproofing coatings and corner tapes
  • PPR and PVC water and drainage installations
  • Floor and wall drains with a correct fall
  • Sanitary ware, shower systems and taps of your choice

From practice

From practice: in a Valjevo flat we turned an old bathroom with a tub into a spacious walk-in shower with a floor drain, new pipework and waterproofing - coordinating with the tiler to keep the schedule on track.

How we work

  1. Step 1

    Strip-out

    We remove the old sanitary ware and open the walls for the new pipework.

  2. Step 2

    New installations

    We set the water and drainage points exactly to the fixture layout.

  3. Step 3

    Waterproofing

    We waterproof the wet zones before the tiler starts laying tiles.

  4. Step 4

    Fit-out & handover

    We fit the sanitary ware and taps, test everything and hand over a finished bathroom.

Frequently asked questions

Do you do the whole remodel or just the plumbing?

We handle the plumbing side - installations, waterproofing and sanitary fit-out - and coordinate with the tiler and other trades. We can recommend trusted partners for tiling and painting if you need them.

How long does an average bathroom remodel take?

It depends on scope, but an average bathroom is usually finished in one to two weeks, including the time for waterproofing and tile adhesive to cure. We give an exact timeline after a site visit.